Our history

Our journey as Company

IASOL
2005

IASOL is Founded

IASOL was found in Zaragoza as a company specialising in photovoltaics (Ingeniería de Aplicaciones Solares Zaragoza 2.005, S.L)

2006

IASOL carried out the first grid connected installation in the province of Teruel

2007
2008

IASOL undertook the development and EPC of the first solar park exceeding 1MW built in Aragón.

2008

IASOL developed the first rooftop installation exceeding 1 MW in Spain

2010

IASOL installed the largest rooftop plant using CIGS technology.

2011

IASOL carried out the engineering and technical management of the 2 most important solar carport projects in the world, at the Renault factories in France, in partnership with Elecnor, comprising two installations of 10,5MWp

2018

IASOL established its Project Development Department, with the first solar parks developed in the Canary Islands

2019

IASOL built the largest photovoltaic park in Zaragoza, "El Marqués" of 12,4 MWp.

2020

Construction of the 12,65MWp Quemadas photovoltaic park in Ejea de los Caballeros (Zaragoza).

Electrical assembly and commissionning of the largest combined self-consumption installation in Spain (ground-mounted and rooftop), with a capacity of 8.8MWp for Nurel (Samca Group)

IASOL opened a branch in the Canary Islands based in Fuerteventura.

2021

Construction of the12,7MWp Marton photovoltaic solar park in Zuera.

IASOL opened offices in Madrid and Castilla y Léon ( Valladolid)

2022

Development and construction of the first self-consumption installation under a PPA model(6,89MWp)

IASOL opened an office in the Levante region.

2023

Development and construction of the 34MWp Acampo Extrén solar park in Zaragoza.

Installation and hybridisation of 10MWh of energy storage (BESS)

2024

Design and construction of the largest self-consumption installation in the province of Teruel, 5,5MWp for Ronal Ibérica.

Construction of the 39MWp Merinero photovoltaic solar park in Valladolid.

Installation and hybridisation of 12MWh of energy storage (BESS)

IASOL opened its first international subsidiary in Rome (Italy)
2025

Construction of the 45MWp Gamudejar photovoltaic solar park in Hijar (Teruel).

Construction of El Goro 5MWp, the largest energy community in Spain en Telde ( Las Palmas).

2026

Construction of 40MWp photovoltaic cluster in Northern Italy ( Piedmont and Lombardy).

Installation and hybridisation of 10MWh of energy storage (BESS).